Essay Writer » Essay Blog » Business Essays Help » Scheduling Workbook

Scheduling Workbook

Scheduling Workbook Part 1 Instructions

Part 1 of the Workbook assignment includes the sections on Block Times (Taxi In, Taxi Out, Flight Times and Total Block Times) and Turnaround Times.

For the Block Time exercises, complete and submit your responses to any area which is shaded in yellow.

For the Turnaround Time exercises, complete and submit your responses to any area which is shaded yellow, green or blue.

Submit your work as a Word document in one (1) file to the Dropbox no later than Friday, April 13th at 11:55pm.

Block Time Exercises

Determine the average Taxi Out times:

Taxi Out

Flight 1

Taxi Out

Flight 2

Taxi Out

Flight 3

Taxi Out

Flight 4

Average

Taxi Out

101510710.5
1111139
8884
9101112

Determine the average Taxi In times:

Taxi In

Flight 1

Taxi In

Flight 2

Taxi In

Flight 3

Taxi In

Flight 4

Average

Taxi In

56655
6666
7768
4686

Determine the average Flight Times:

Aircraft

Type

Avg Flight

Profile Speed

(MPH)

City Pair Distance

(Miles)

Flight Time (Hours)Flight Time (Minutes)
A1A3757502120
B2B40012003
C3C3555751.62
D4D3306752.05

Determine the Block Times:

Taxi InTaxi OutFlight Time in HoursFlight Time in MinutesBlock Time in Minutes
562.2132143
693.7222
711.7545
481.9114

Minimum Turnaround Time Exercises

In the workbook, there are 4 exercises that require you to estimate the elapsed time it will take the ground crew to unload, clean and reload the aircraft for its’ next flight(“turnaround time”). There are also several examples to help you understand how the sequence of ground servicing works during a turnaround.

Study the examples to learn what activities take place inside the aircraft and which activities are occurring outside of the aircraft. Think in terms of production line where various work is taking place simultaneously in different parts of the factory but all components have to come together to produce the final product.

One of the concepts you will have to consider in these exercises is that of simultaneous or “concurrent” activities. I recognize most, if not all, of the class has no airline experience which would help you to know which activities can be done simultaneously. However, I suspect most everyone has flown at some point so you have some idea of how the turnaround process works.

In concurrent, or simultaneous, work, think about which activities can be accomplished at the same time. As an example, passengers cannot deplane and enplane at the same time. Cargo cannot be unloaded and reloaded at the same time. However, the interior of the aircraft can be cleaned at the same time various activities are occurring outside of the aircraft (such as unloading cargo). Where concurrent activities become difficult to assess is in “grey” areas such as maintenance. If maintenance is taking place in the aircraft cabin, as an example (i.e., repairing a seat) then obviously passengers cannot board the aircraft for the departing flight. Similarly, if maintenance is taking place in the vicinity of a cargo compartment, the ground staff will have to wait until the maintenance is complete before the cargo can be loaded (or even unloaded, depending on the nature of the maintenance).

While I recognize you do not have specific knowledge about concurrent or simultaneous activities, I have included an area in the following answer grids for you to provide a short explanation of why you think an activity is concurrent or not. I brief explanation is sufficient. See the example explanations for the scope of what an acceptable response would be. During grading of these worksheets, the focus will be on your logic more than a correct or incorrect answer. I’m not looking for right or wrong answers versus how you viewed the concurrent or non-concurrent activities.

In each of the answer grids below, the assignment is to complete any of the boxes which are shaded in yellow, green or blue. The yellow cells are the primary data for each line item. The green cells will reflect the sum (or total) of the times for each of the major work areas (cabin interior, aircraft exterior, etc.). Finally, the blue cell is for your final answer as to the total turnaround time. Example exercise No. 1 in the workbook has been entered into the response grid below to help guide you in how to complete each worksheet. Refer to the Example in the Workbook to review how each number fits into the answer grid below.

Turnaround Time EXAMPLE No. 1

ActivityConcurrent?

(Yes or No)

Concurrent ExplanationTime Required (minutes)Total Time (minutes)
External Power & AirNONot concurrent. Must be completed before other work begins5
Total Time – Ext. Power and Air5
AIRCRAFT INTERIOR
Passenger DeplaningNONot concurrent. Arriving passengers must deplane before departing passengers can board the aircraft8
Interior Cleaning and CateringYESCan be accomplished while passengers are deplaning8
Passenger BoardingNONot concurrent. Departing passengers cannot board the aircraft before arriving passengers have exited the aircraft20
Total Time – Aircraft Interior28
AIRCRAFT EXTERIOR
Cargo UnloadingNONot concurrent. Must be accomplished before the departing cargo can be loaded5
Aircraft MaintenanceN/AN/A for this example0
FuelingN/AN/A for this example0
Lavatory ServicingYESCan be accomplished simultaneously with passenger loading6
Cargo LoadingNONot concurrent. Cannot be accomplished before the cargo is unloaded20
Total Time – Aircraft Exterior25
Flight Crew Connecting TimeN/AN/A for this example0
Hub Adjustment TimeN/AN/A for this example0
Total Time – Crew Connect. and Hub Adjust.0
TOTAL TURNAROUND TIME33

Turnaround Time Exercise No. 1

ActivityConcurrent?

(Yes or No)

Concurrent ExplanationTime Required (minutes)Total Time (minutes)
External Power & Air
Total Time – Ext. Power and Air
AIRCRAFT INTERIOR
Passenger Deplaning
Interior Cleaning and Catering
Passenger Boarding
Total Time – Aircraft Interior
AIRCRAFT EXTERIOR
Cargo Unloading
Aircraft Maintenance
Fueling
Lavatory Servicing
Cargo Loading
Total Time – Aircraft Exterior
Flight Crew Connecting Time
Hub Adjustment Time
Total Time – Crew Connect. and Hub Adjust.
TOTAL TURNAROUND TIME

Turnaround Time Exercise No. 2

ActivityConcurrent?

(Yes or No)

Concurrent ExplanationTime Required (minutes)Total Time (minutes)
External Power & Air
Total Time – Ext. Power and Air
AIRCRAFT INTERIOR
Passenger Deplaning
Interior Cleaning and Catering
Passenger Boarding
Total Time – Aircraft Interior
AIRCRAFT EXTERIOR
Cargo Unloading
Aircraft Maintenance
Fueling
Lavatory Servicing
Cargo Loading
Total Time – Aircraft Exterior
Flight Crew Connecting Time
Hub Adjustment Time
Total Time – Crew Connect. and Hub Adjust.
TOTAL TURNAROUND TIME

Turnaround Time Exercise No. 2

ActivityConcurrent?

(Yes or No)

Concurrent ExplanationTime Required (minutes)Total Time (minutes)
External Power & Air
Total Time – Ext. Power and Air
AIRCRAFT INTERIOR
Passenger Deplaning
Interior Cleaning and Catering
Passenger Boarding
Total Time – Aircraft Interior
AIRCRAFT EXTERIOR
Cargo Unloading
Aircraft Maintenance
Fueling
Lavatory Servicing
Cargo Loading
Total Time – Aircraft Exterior
Flight Crew Connecting Time
Hub Adjustment Time
Total Time – Crew Connect. and Hub Adjust.
TOTAL TURNAROUND TIME
Turnaround Time Exercise No. 3
ActivityConcurrent?

(Yes or No)

Concurrent ExplanationTime Required (minutes)Total Time (minutes)
External Power & Air
Total Time – Ext. Power and Air
AIRCRAFT INTERIOR
Passenger Deplaning
Interior Cleaning and Catering
Passenger Boarding
Total Time – Aircraft Interior
AIRCRAFT EXTERIOR
Cargo Unloading
Aircraft Maintenance
Fueling
Lavatory Servicing
Cargo Loading
Total Time – Aircraft Exterior
Flight Crew Connecting Time
Hub Adjustment Time
Total Time – Crew Connect. and Hub Adjust.
TOTAL TURNAROUND TIME
Turnaround Time Exercise No. 4
ActivityConcurrent?

(Yes or No)

Concurrent ExplanationTime Required (minutes)Total Time (minutes)
External Power & Air
Total Time – Ext. Power and Air
AIRCRAFT INTERIOR
Passenger Deplaning
Interior Cleaning and Catering
Passenger Boarding
Total Time – Aircraft Interior
AIRCRAFT EXTERIOR
Cargo Unloading
Aircraft Maintenance
Fueling
Lavatory Servicing
Cargo Loading
Total Time – Aircraft Exterior
Flight Crew Connecting Time
Hub Adjustment Time
Total Time – Crew Connect. and Hub Adjust.
TOTAL TURNAROUND TIME

 